Search Documents

Sort by

  • CIM
    Design and Construction of Tailings Ponds and Reclamation Facilities - Case Histories (ClM Bulletin, October 1978)

    By J. D. Jones

    The geographic occurrence of economic mineral deposits presents a variety of problems in modern tailings disposal operations. This paper presents case histories in several sectors of the mineral indus

    Jan 1, 1978

  • AUSIMM
    Design and Construction of the Access Tunnels for the New Top Ryde City Shopping Centre, Northern Sydney

    By Q Yang

    This paper describes the design and construction of three 7.2 m span access ramp-tunnels to the three level underground car park of the newly redeveloped Top Ryde City Shopping Centre in northern Sydn

    Mar 8, 2011

  • DFI
    Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off Wall

    By James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.

    "The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150

    Jan 1, 2016

  • DFI
    Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in London

    By Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow

    "Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of

    Jan 1, 2005

  • DFI
    Design And Construction Of The Deepest Cfa Pile In Australia

    By W. L. Chong

    For a project located in Docklands Victoria, a high-rise development was proposed where the geology comprised soils of various compositions and consistencies to approximately 50m deep before being und

    Nov 1, 2022

  • SME
    Design And Construction Of The Exploratory Shaft Facility -A Regulatory Perspective

    By J. Peshel

    This paper presents a regulatory perspective of the design and construction of the Exploratory Shaft Facility which may become part of the future high-level waste repository. Site characterization con

    Jan 1, 1989

  • SME
    Design and Construction of the NBAQ4 Project— First Urban EPB TBM Tunnel in Metro Manila - RETC2023

    By Abegail Endraca, Allan Sebastian, Andrew Raine, Allan Patdu

    The project involves the construction of a new aqueduct tunnel by an Earth Pressure Balance TBM tunnel for the Novaliches-Balara Aqueduct No 4 (NBAQ4) project in Metro Manila. It comprises a 7.3 km lo

    Jun 13, 2023

  • SME
    Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021

    By David Mast, Amanda Foote, Mina Shinouda

    The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5

    Jun 13, 2021

  • TMS
    Design And Construction Of The Noranda Converter At The Borne Smelter

    By Michel Boisvert

    Noranda Metallurgy is presently completing construction of the new Noranda Converter (NCV) at its Home Smelter in Rouyn-Noranda. This capital investment of CDN$56M is the continuation of the Emissions

    Jan 1, 1998

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2005

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations f

    Jan 1, 2013

  • DFI
    Design And Construction Of The Sutong Bridge Foundations

    By Robert B. Bittner

    The Sutong Bridge across the lower Yangtze River in China will have, when completed, the longest span (1,088 m) and the highest towers (306 m) of any cable stayed span in the world. The foundations fo

    Jan 1, 2007

  • DFI
    Design And Construction Of Underground Basin Using Composite Slurry Wall 500 Feet Away From The Pacific Ocean

    By Ihab Allam PE, Meeok Kim. PE. Ph. D

    The wet weather equalization basin (EB) planned for Pacifica, CA is a 45 feet deep rectangular shaped underground water tank containing over 2.1 million gallons of water, and located only 500 feet awa

  • SME
    Design And Construction Of Wyoming's First Major Sediment Control Reservoir Using Settleable Solids Effluent Criteria

    By P. Kim Carroll, D. Nick Tiffany, Doyl M. Fritz

    Thunder Basin Coal Company received the 1987 Wyoming Excellence in Surface Mining Award for construction of the State's first major sediment control reservoir to be designed using the new settlea

    Jan 1, 1989

  • SME
    Design and Construction Procurement for the Amtrak Hudson Tunnel Project

    By Phil Rice, Mohammed Nasim, Richard Flanagan

    "The Gateway Trans-Hudson Partnership (GTHP), a joint venture of WSP USA, Inc., AECOM USA, Inc, and STV Incorporated, is providing preliminary engineering services to Amtrak for the Hudson Tunnel proj

    Sep 1, 2019

  • DFI
    Design and Delivery of Micropile Installation Leveraging Augmented and Virtual Reality

    By Guilherme L. M. G. Carvalho, Zachary T. Fleming

    In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser

    Jan 1, 2019

  • NIOSH
    Design And Development Contract For Uplink Environmental Monitor

    By T. G. Mayhew, A. A. Bergeron, R. J. Mahany

    This report describes an operational communications system which provides remote intra-terrestrial wireless transmission of environmental information. Design and modification specifications of requisi

    Jan 9, 1976

  • AUSIMM
    Design and Development of Energy-efficient Secondary Axial Flow Fans

    By J J. L du Plessis, S Viviers, G Ratner

    Escalating electricity costs are one of the biggest operational cost drivers in mining. The trend to use high-powered auxiliary fans delivering increased airflow to meet the dilution requirements of d

    Aug 31, 2015

  • SAIMM
    Design and development of lightweight Fe- Mn alloys for storage and transportation of liquified natural gas (LNG) — Computational materials modelling study

    By J. Moema, L. Mampuru, M. Phasha, D. Mkhonto

    The global liquified natural gas (LNG) storage market size is projected to reach USD17.5 billion by 2025. Currently, owed to its high toughness, tensile strength, and excellent weldability, the 9% nic

    Mar 4, 2025

  • SME
    Design and Development of Novel Flotation Reagents for the Beneficiation of Mountain Pass Rare-Earth Ore

    By Pradip

    Bastnaesite, a rare-earth fluocarbonate, was separated from associated calcite and barite gangue minerals in the Mountain Pass, CA rare-earth ore beneficiation plant by froth flotation using fatty aci