Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Wireless Optical Displacement Sensor for Convergence and Divergence Monitoring - RETC2023By Raphael Victor
The construction and modification of tunnels brings a requirement for precise measurement of convergence and divergence to safeguard the structure, maintain safety and provide the assurance needed to
Jun 13, 2023
-
Acclimatization: Adapting Conventional Tunnel Lining Techniques to Overstress Rock Conditions - RETC2023By Ross Goodman, Jean-Luc des Rivières
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges which, continuing to develop over time, hampered excavation completion and impacted the cast-in-place final lining
Jun 13, 2023
-
Design-Build Project Delivery Method Selection and Implementation of a GBR-B and GBR-C for the Pawtucket Tunnel - RETC2023By Robin Dill, Julian Prada, Kathryn Kelly, Brian Hann, Todd Moline
Narragansett Bay Commission’s (NBC) Pawtucket Tunnel Project includes construction of the 11,600-ft long, 30-ft ID, deep rock tunnel. This paper presents insight into the features and benefits of lump
Jun 13, 2023
-
Record-Setting Tunnel Boring Below Lake Ontario at the Ashbridges Bay Outfall Tunnel - RETC2023By Doug Harding
The 3.5 km long Ashbridges Bay Outfall in Toronto, Ontario, Canada was a challenging drive set below Lake Ontario. After a remote machine acceptance due to the global pandemic, an 8 m diameter Single
Jun 13, 2023
-
Enhanced Probe Drilling and Pre-Grouting Design and Recommendations on Hard Rock TBMs - RETC2023By Stryker Magnuson
While probe drills are not strictly necessary for all projects, the incorporation and use of probe drills and pre-grouting adds capability and insurance to boring operations. Water ingress and unstabl
Jun 13, 2023
-
Missouri River Intake Screen Structure and Tunnel: Overcoming Underground Challenges to Build Vital Infrastructure - RETC2023By Ryan Ward
The Missouri River Intake Screen Structure and Tunnel (MRISST) is one phase of the Red River Valley Water Supply Project (RRVWSP), a vital piece of infrastructure in the state of North Dakota to trans
Jun 13, 2023
-
SVCW Gravity Pipeline—Ground Movements During Construction - RETC2023By Nik Sokol, Eric Sekulski, Leo Weiman-Benitez, Jon Hurt, Shrinidhi Vijayakumar, Phaidra Campbell
The Silicon Valley Clean Water (SVCW) Gravity Pipeline (GP) is the first Progressive Design Build (PDB) tunnel completed in North America. As part of the Regional Environmental Sewer Conveyance Upgrad
Jun 13, 2023
-
Major Rehabilitation of the Montreal 55 Years Old Lafontaine Immersed Tube Highway Tunnel—Design Considerations - RETC2023By Laurent Rus, Bakar Amara, Jean Habimana
The La Fontaine Tunnel in Montreal, Quebec is currently undergoing major structural rehabilitation work and systems upgrade work to comply with current codes, standards and best practices in fire life
Jun 13, 2023
-
Ashbridges Bay Treatment Plant Outfall TBM Risk Mitigation— Prescriptiveness and Verification of TBM Fabrication - RETC2023By Dan Ifrim, Andre Solecki
Tunneling could be a major challenge to tunneling contractors as tunneling operations can be seriously affected by the Tunnel Boring Machine (TBM) performance. Specifying the appropriate TBM methodolo
Jun 13, 2023
-
Hard Rock TBMs—The Experience of Brenner Basis Tunnel, Construction Lot Mules 2-3, for the Evaluation of Risk Prediction Tools - RETC2023By A. Mei, F. Amadini, F. Cernera, D. Baliani, A. Flor, M. La Morgia, F. Sassi
The risk of TBM jamming because of squeezing rock mass or excessive caving (instability of the cavity) conditions is always a focal point while boring long and deep tunnels with shielded TBMs. Mechani
Jun 13, 2023
-
Bad Bergzabern Bypass Tunnel—NATM Tunneling Through Vineyards - RETC2023By Ralf Plinninger, Pafos Busch, Richard Gradnik
This paper presents the details of the Bad Bergzabern tunnel project. This tunnel is the main part of the B427 federal road bypass, intended to improve the regional traffic infrastructure and to reduc
Jun 13, 2023
-
Risk-Based Design Study and Innovative Ventilation Strategy for a High-Gradient Short Tunnel - RETC2023By Reinhard Gertl, Maximilian Weithaler, Harald Kammerer, Juan Pablo Muñoz, Juan-Carlos Rueda
The Guillermo Gaviria Echeverri tunnel and its access roads project in Antioquia, Colombia is a mega infrastructure project that includes a road network with the longest tunnel in Latin America and se
Jun 13, 2023
-
Carbon Footprint Reduction in Montreal Blue Line Extension - RETC2023By V. Nasri, P. Jarast, M. Bakhshi
The Montreal metro Blue Line Extension toward the northeast consists of the construction of five new underground stations. The project includes 6 kilometers of the tunnel which will be constructed usi
Jun 13, 2023
-
Various Rock Tunneling Methods Utilized on the Doan Valley Storage Tunnel Project - RETC2023By Chris Lynagh, Collin Schroeder
Determining the best excavation method is a critical step in successful tunnel construction. In rock tunneling, several factors can dictate the excavation method, such as: (1) rock characteristics, (2
Jun 13, 2023
-
Virtual Master Rings—Replacing a Tradition - RETC2023By Dieter Loh, Mathias Knoll, Florian Werres
When a new tunnelling project starts, it has been a vital tradition for decades to cast and erect master rings horizontally on a flat surface to demonstrate the compliance with dimensional tolerances.
Jun 13, 2023
-
Packaging and Contract Delivery Methods for the Horizon Lateral - RETC2023By Ray Brainard, Adriana Ventimiglia, Amanda Kerr
The $2 billion Horizon Lateral includes over 30 miles of trenched and tunneled pipeline with diameters up to 120 inches.Related infrastructure includes large and small pumping stations, reservoirs, an
Jun 13, 2023
-
Tunnel Condition Assessment: State of the Practice - RETC2023By Ali Hafiz, Aidin Golrokh, Tom Iseley, Kaz Tabrizi, Saleh Behbahani
In the USA many highway tunnels were built during the 1930s through 1960s. This indicates that these tunnels have exceeded their intended design service life. Based on the initial tunnel inventory con
Jun 13, 2023
-
Eisenhower Memorial Tunnel—50 Years Later - RETC2023By Neal Retzer, Adam Bedell, Nick Cioffredi
The first wagon trail across Loveland Pass was built in 1869 thus starting the struggle between the Colorado Rockies and interstate travel. The 1st Pioneer Bore underneath Loveland Pass at the Contine
Jun 13, 2023
-
Large Diameter Shaft Excavation Support Design and Blasting Methods in a Dense Urban Environment for the Pawtucket Tunnel Project - RETC2023By Frederic Souche, Andrew R. Klaetsch, Brian Hann, Nick Goodenow
This paper describes support of excavation (SOE) design and construction for three large diameter shafts excavated through glacial soil and controlled blasting in complex sedimentary rock formations.
Jun 13, 2023
-
Kramer Tunnel—Construction of the Ventilation Shaft Project in Germany’s Southern Alps - RETC2023By Lukas Walder, Roland Arnold, Raphael Zuber, Richard Gradnik
This paper presents the construction of the ventilation shaft for the single-tube, doublelane Kramer tunnel. The project is located in the Federal State of Bavaria, Germany. This road tunnel, which ha
Jun 13, 2023