Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021By Ross Goodman, Jesse Salai
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the
Jun 13, 2021
-
Lyon Metro Line B Extension: A Variable Density TBM for an Underground Mission in Remarkably Diverse Geology - RETC2021By Karin Bäppler
Lyon with half a million inhabitants is the third largest city in France. Urban agglomerations such as Greater Lyon demand intelligent underground solutions for the freedom of mobility of its inhabita
Jun 13, 2021
-
The Role of Small Diameter Tunneling for Pipeline Installations - RETC2021By P. Schmäh
Nowadays, small diameter tunnels are increasingly considered in pipeline projects as an alternative for sensitive crossings or when soil conditions limit the use of conventional pipeline installation
Jun 13, 2021
-
Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz
Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met
Jun 13, 2021
-
Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi
The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op
Jun 13, 2021
-
Design Build and Design Bid Build Traditional Project Delivery Methods and Modern Industry Trends. What is Most Efficient?By Giuseppe M. Gaspari, Tamara Kondrachova
Contract practices affect cost and schedule of tunneling works, impacting risk allocation between Owners and Contractors. The Authors compiled a dataset of projects constructed in the Toronto Area bet
Jun 13, 2021
-
Abrasivity and Cutter Life Assessment for TBM Tunneling in Cobbles and Boulders - RETC2021By Steven W. Hunt, Glen R. Frank
Assessment of abrasivity and cutter life are necessary to properly manage risks when tunneling in mixed face ground which includes ground with cobbles and boulders. Maximizing cutter life requires: (1
Jun 13, 2021
-
Steady State, Groundwater Inflows in Deep Rock Tunnels - RETC2021By MARK J. VANARELLI
Estimating groundwater inflows in rock deep tunnels is critical to the safety of personnel constructing the tunnel and the cost of construction. This paper presents two case studies for estimating ste
Jun 13, 2021
-
Accelerated Rehabilitation of the White Rock Tunnel - RECT2021By Nathan Bowersox, Zuzana Skovajsova, David M. Jurich, Brian Harris
When unwatered after more than 50 years of operation, the White Rock Tunnel of the Upper American River Project in the foothills of the Sierra Mountains exhibited failing rockbolts and ground falls. R
Jun 13, 2021
-
Tunneling Under Pleasure Bay with an Open-Face TBM - RETC 2021By Joshua Farmer, Mike Gianforte, Tao Jiang, William Gettings
The Two Rivers Water Reclamation Authority (TRWRA) in Monmouth County, New Jersey, is replacing its aging Pleasure Bay Interceptor (PBI) with a new 54-in interceptor in a 3,250-foot long 8 to 10-foot
Jun 13, 2021
-
The Use of Structural Codes in Tunneling - RETC2021By Harry Asche
Tunnels are frequently specified by owners to be designed to a structural code, often a bridge code. In the USA, AASHTO have created a tunnel code, based on structural principles, the AASHTO LRFD Tunn
Jun 13, 2021
-
Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g
Jun 13, 2021
-
Application of Surrogate Modeling for SEM Tunneling SimulationBy Christophe Bragard, Marte Gutierrez, Haotian Zheng, Michael Mooney
This paper proposes a framework for applying surrogate-based approaches to evaluate SEM construction, which can both benefit the uncertainty analysis in the design stage and real-time calibration duri
Jun 13, 2021
-
Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021By Jamal Rostami, Wei Hu
Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us
Jun 13, 2021
-
A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer
Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast
Jun 13, 2021
-
Back on Track: The Downtown Rail Extension - RETC2021By Meghan M. Murphy, Derek Penrice
The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil
Jun 13, 2021
-
Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021By Gino Vogt
In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations
Jun 13, 2021
-
Short Startup for a High Pressure Mixshield Tunnel Boring Machine - RETC2021By Matthew Burdick, Andrew Rule, Erica Bailey
The Second Narrows Water Supply Tunnel, Burrard Inlet Crossing project for the Greater Vancouver Water District entails deep shaft construction, subway sized pressurized face tunneling through highly
Jun 13, 2021
-
Performance of Tunnel Segments Reinforced with Synthetic Macro Fibers - RETC2021By Todd Clarke, Ralf Winterberg
For more than a decade the tunneling industry has explored the potential and benefits of macro synthetic fiber (MSF) reinforced concrete solutions for precast tunnel segments. Parallel to industry inv
Jun 13, 2021
-
Construction of an Outfall Tunnel Underneath Rio De La Plata - RETC2021By Mirko Martini, Marcelo Benaglia, Andrea Codalli
Riachuelo Lot 3 forms part of a sanitation programme being implemented in Argentina to relieve the Riachuelo river basin from its current contamination. The programme, by far the most important in its
Jun 13, 2021