Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Gowanus Pumping Station; Jet Grout Bottom Seal and Deep Support ColumnsBy Paul C. Schmall, Kevin Clarke, Paul J. Lewis, John M. Stanbury
"The $200M rehabilitation of the more than 100-year-old Gowanus Flushing Tunnel and pumping station located on the Gowanus Canal in Brooklyn, NY required deep excavations in an extremely congested urb
Jan 1, 2016
-
Ground Disturbance Due to Static Pressure Driving of Opened-Ended PHC PilesBy Xiaocen Lu, Guowei Li, Jiantao Wu, Thang N. Nguyen, Andrew C. Amenuvor
"This paper investigates the effect of driving a group of 52 open-ended Prestressed High Strength Concrete (PHC) piles on an existing highway embankment based on field measurements of excess pore pres
Jan 1, 2016
-
Ground Freezing for Construction at the Port of Miami TunnelBy Roger Storry, Arnaud Hochart, David Harris, Olivier Martin
"INTRODUCTIONThe Port of Miami Tunnel (POMT), designed and constructed by Bouygues Civil Works Florida between 2009 and 2014, was a Public Private Partnership between the Miami Access Tunnel Concessio
Jan 1, 2016
-
Ground Freezing for Groundwater Cutoff at the Seattle Seawall Replacement ProjectBy Brenton Cook, Daniel Mageau, Larry Applegate, Aaron McCain
"Ground freezing was successfully used to create an impermeable barrier wall along 3,000 feet of the downtown Seattle waterfront as part of the Seattle Seawall Replacement Project. This $360 million r
Jan 1, 2016
-
Ground Freezing to Repair Leaks in a Slurry Wall ShaftBy Shawn P. Coughlin, Michael A. Schimmenti, Juan Leonardo Tello del Pino
"PROJECT OVERVIEWThe Sistema de Potabilización Área Norte project (Northern Area Purification System) was a major expansion of the potable water system in Buenos Aires Province, Argentina. The aim of
Jan 1, 2016
-
Ground Investigation and Tunnel Design for the Liantang/Heung Yuen Wai Boundary Control Point and Associated WorksBy Guy Bridges, Elton Ko, Cheng Ting Ning, Owen Ng, Giovanni Chang, Robert Anderson
"PROJECT OVERVIEWThe Liantang/Heung Yuen Wai Boundary Control Point (BCP) and Associated Works will be the seventhland crossing between Shenzhen and the Hong Kong Special Administrative Region (HKSAR)
Jan 1, 2016
-
Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric ProjectBy Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews
"The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re
Jan 1, 2016
-
Effects of Tunnel Excavation on Historical Buildings by a Fully Coupled Soil-Structure Interaction 3D Analysis - A Case Study From Copenhagen “Cityringen” Metro LineBy Luisa Alfieri, Giorgio Fantauzzi, Sergio Notarianni, Spencer Cavagnet, Alessandro Damiani
"The new tunnels of the Copenhagen ""Cityringen"" will be excavated, at Kongens Nytorv square, crossing over the existing M1 and M2 metro lines. After the crossing, the tunnels will underpass the hist
Jan 1, 2016
-
Ethical and Risk Aspects of Deep Foundation SubcontractsBy Alexander Filotti, Richard Kalson
"In the last decade, the construction industry has witnessed significant changes in the project delivery systems and contractual relationships between the general contractors (GC) and Deep Foundation
Jan 1, 2016
-
Evaluation of Soil-Bentonite Backfill Consolidation PropertiesBy Jeffrey C. Evans, Daniel G. Ruffing, Hejintao Huang
Soil-bentonite slurry trench cutoff walls are the most common type of vertical cutoff wall used in the US for seepage control and for passive control of contaminant migration at environmental sites.
Jan 1, 2016
-
Application of the UNFC-2009 to Metals' Production WasteBy V. Panayotov, M. Panayotova, R. Villas-Bôas
The "United Nations Framework Classification (UNFC-2009) for Fossil Energy and Mineral Resources 2009” is the international system designed to meet (to the extent possible) the needs and to support th
Jan 1, 2016
-
Removal of Oxyanions from Metals' Extraction Wastewater by Modified ZeoliteBy V. T. Panayotov, M. I. Panayotova
Wastewater from mining and mineral processing activities is often polluted by anion forming metals, such as molybdenum and chromium. Low cost materials, including zeolites, are studied for removing he
Jan 1, 2016
-
Transactions Volume 340 2016 - SME Transactions 2016By Chee S. Theng
As the 2016 president of the Society for Mining, Metallurgy & Exploration Inc., I am pleased to present the 2016 issue of the Transactions of the Society for Mining, Metallurgy & Exploration Inc., Vol
Jan 1, 2016
-
An analysis of roof bolter fatalities and injuries in U.S. mining - SME Transactions 2016By A. Podlesny, E. N. Rubinstein, J. J. Sammarco, B. Demich
Roof bolting typically follows the extraction of a commodity to help keep the roof from collapsing. During 2004 to 2013, roof bolter operators had the highest number of machinery-related injuries, acc
Jan 1, 2016
-
Rheology of Foam-Conditioned Sands in EPB TunnelingBy Markus Thewes, Mario Galli
"INTRODUCTIONProject-related studies showed that lab tests are a helpful tool for the planning of EPB tunneling and soil conditioning in cohesionless soils. This type of ground commonly represents the
Jan 1, 2016
-
Rehabilitation of the Kölnbrein Dam / AustriaBy Frank Haehnig, Kurt Kogler
"With a height of 200 m, a crown width of 626 m and a concrete volume of 1.6 million m³, the Kölnbrein Dam in the upper Malta valley in Carinthia / Austria is the largest concrete dam in Austria. Boas
Jan 1, 2016
-
Removal of the Former San Francisco-Oakland Bay Bridge Foundation Caisson E3 by Mechanical Means and ExplosivesBy Michael Gebman, Jack Gerwick
"With the opening of the new San Francisco-Oakland Bay Bridge East Span, the former bridge and its caisson foundations are being demolished. Caisson foundations are in the path of a future shipping ch
Jan 1, 2016
-
Replacement of the Kosciuszko Bridge Brooklyn Connector: An Integrated Design and Construction ApproachBy M. D. Riegel, P. B. Pizzimenti, E. M. Zamiskie, Britain A. Materek
"The Skanska/Kiewit/ECCO III team (SKE) in association with HNTB was awarded the design-build contract for Phase I of the Kosciuszko Bridge Replacement Project. As lead designer for the SKE team, HNTB
Jan 1, 2016
-
Protection of Waterfront Properties by Pressed-In Sheet Pile SeawallsBy Ian Vaz, Takefumi Takuma, Rafael Holcombe, Chris DellAringa
"This paper will discuss the successful installation of seawalls for the first phase of a project in Long Beach in California known as the Naples Island Permanent Seawall Repair – Phase 1. How an unco
Jan 1, 2016
-
Physical Modeling and Development of Design Criteria for Maintainable Drains for Earth Retention SystemsBy J. Erik Loehr, Andrew Z. Boeckmann
"Poor drainage is a common cause of poor performance of earth retention systems, resulting in burdensome serviceability problems that can progress to outright failure of the retention system if not ad
Jan 1, 2016