Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield
During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin
Jun 13, 2021
-
NEBT Project: The Application of Artificial Intelligence (AI) to Improve TBM Operations - RETC2021By Rajat Gangrade, Haotian Zheng, Jarrett Smith, Daniele Nebbia, Mike Mooney
The application of artificial intelligence (AI) to improve tunnel boring machine (TBM) operations requires a significant amount of information to train robust performance prediction models, e.g., for
Jun 13, 2021
-
The Use of Low-Density Cellular Concrete (LDCC) in Annular Fill Applications: Kaneohe-Kailua Sewer Tunnel Case Study - RETC2021By Don Painter, Nico Sutmoller, Lori M. K. Kahikina, Brian Dorwart
This paper will address the feasibility of using low-density cellular concrete (LDCC) for an annular fill application where project conditions required pumping the LDCC material for distances of up to
Jun 13, 2021
-
CMAR Delivery Targets Effective Management of Risks in Achieving Water Supply Objectives - RETC2021By Cary Hirner, Sarah Lothman, Chris Mueller, Savita Schlesinger, Mike Hanna, Ian Fitz-James
Loudoun Water is currently implementing a quarry to reservoir conversion that will improve water supply reliability in periods of drought and flexibility in water supply operations when turbidity in i
Jun 13, 2021
-
InSAR Monitoring of Tunneling Surface Displacement - RETC2021By Brian Young, Ben Pantony
Interferometric Synthetic Aperture Radar (InSAR) has played an integral role in many large scale tunneling projects globally. Until recently, it has been regarded as a complementary monitoring tool. O
Jun 13, 2021
-
Tunnel Spitzenberg—Tunnel Drive Hits a Historic Quarry - RETC2021By Pafos Busch, Martin Fischer, Johannes Jaeger
The Spitzenberg Tunnel is a 600 m (1,970 ft) long twin tube motorway tunnel on Germany’s Autobahn A44 between Kassel and Eisenach. Since flexibility was considered to be very important in the continuo
Jun 13, 2021
-
Under Pressure: Geotechnical Forces and Conditions at Work on the Ohio River Tunnel Project - RETC2021By Ross Goodman, Jesse Salai
The Ohio River Tunnel Project encountered multiple unexpected geotechnical challenges such as crown and invert instability due to the overstress condition affecting the strata above, below, and in the
Jun 13, 2021
-
TBM Removal Within the Busiest Passenger Interlocking in the United States - RETC2021By Devan Naik, Matthew Stokes, Andy Nigro
This paper describes the surgical removal of a 24 ft dia. Slurry Shield TBM entombed beneath one of the country’s busiest commuter rail interlockings, the Harold Interlocking in Queens, NY, and the co
Jun 13, 2021
-
Lessons Learned at the Trampas Dam Inlet/Outlet Tunnel - RETC2021By Todd Kilduff, Paul Wilkinson
Microtunneling is rarely a straight forward “business as usual” endeavor. More often than not, these projects take twists and turns that require on the fly, out of the box solutions to get the project
Jun 13, 2021
-
The Role of Small Diameter Tunneling for Pipeline Installations - RETC2021By P. Schmäh
Nowadays, small diameter tunnels are increasingly considered in pipeline projects as an alternative for sensitive crossings or when soil conditions limit the use of conventional pipeline installation
Jun 13, 2021
-
Use of a GBR to Deliver Risk Management and Value— City Rail Link, Auckland - RETC2021By Tom Ireland, Sumi Eratne
The approach to Risk Management during the procurement of major projects often has a significant outcome on the ultimate successful delivery of a project. The $NZ4.4B Auckland City Rail Link project i
Jun 13, 2021
-
Case Study on Innovatively Launching a Full-Size TBM in Challenging Ground - RETC2021By John Newby, Mahmood Khwaja, Bernard Theron, Janice McGovern, Bernard Catalano, Michael S. Schultz
Launching a full-size pressurized-face Tunnel Boring Machine (TBM) in difficult ground conditions is always challenging. Recently, few projects have innovated the process by scaling the trenchless met
Jun 13, 2021
-
A Comparison of Grouting Through Segment Ports Versus Grouting Behind the Tailcan of Two Segmentally Lined Rock Tunnels—Coxwell Sanitary Bypass Tunnel Project in Toronto, ON and Westerly Storage Tunnel Project in Cleveland, OH - RETC2021By William Hodder, Lisa Smiley, Ehsan Alav
The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel (CBT) Project in Toronto will extend approximately 10.5 km and be lined using a precast concrete segmental tunnel liner with an intern
Jun 13, 2021
-
Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi
The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op
Jun 13, 2021
-
Design Build and Design Bid Build Traditional Project Delivery Methods and Modern Industry Trends. What is Most Efficient?By Giuseppe M. Gaspari, Tamara Kondrachova
Contract practices affect cost and schedule of tunneling works, impacting risk allocation between Owners and Contractors. The Authors compiled a dataset of projects constructed in the Toronto Area bet
Jun 13, 2021
-
Segment Production 4.0—Automated Segment Production Using RobotsBy Stefan Mede
Robot Supported Moulding—this is the name of Herrenknecht Formwork’s entry to the world of automated segment production. What had been considered impossible for a long time, has been achieved by Herre
Jun 13, 2021
-
Abrasivity and Cutter Life Assessment for TBM Tunneling in Cobbles and Boulders - RETC2021By Steven W. Hunt, Glen R. Frank
Assessment of abrasivity and cutter life are necessary to properly manage risks when tunneling in mixed face ground which includes ground with cobbles and boulders. Maximizing cutter life requires: (1
Jun 13, 2021
-
Segment Design for Exceptional Circumstances: Post Tensioning and Squeezing Ground - RETC2021By Eduardo Velasco, Paz Navarro, Alfonso Navarro, Claudio Cimiotti, Alejandro Sanz, Nick Karlin
The LA Effluent Outfall tunnel is a 7-mile long, 18' internal diameter, secondary treated effluent discharge tunnel currently under construction by Dragados USA for the Los Angeles County Sanitation D
Jun 13, 2021
-
The Use of Structural Codes in Tunneling - RETC2021By Harry Asche
Tunnels are frequently specified by owners to be designed to a structural code, often a bridge code. In the USA, AASHTO have created a tunnel code, based on structural principles, the AASHTO LRFD Tunn
Jun 13, 2021
-
Second Narrows Water Supply Tunnel—Final Design, Procurement and Construction - RETC2021By Gregg W. Davidson, J. Andrew McGlenn, Frank Huber
The Second Narrows Water Supply Tunnel will ensure system reliability in the event of a major earthquake and increase the Greater Vancouver Water District’s capacity to meet the long-term needs of a g
Jun 13, 2021