Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Construction Of Southwest Interceptor #3 And #4 Cleveland, OhioBy Lawrence M. Lenahan
Cleveland's Southwest Interceptor Contracts No. 3 and No. 4 are continuations of Contract No. 1 addressed at the 1987 RETC with geology, equipment, and methods that differ greatly. The two con
Jan 1, 1989
-
Design And Construction of Emergency Pedestrian Egress Tunnels, Essex Junction, VermontBy Bradford F. Townsend, Robin B. Dill, Richard M. Croswell
Innovative geotechnical construction techniques were used to construct three pedestrian tunnels under a building slab-on-grade to allow utilization of basement space for manufacturing. Tunnels were co
Jan 1, 1993
-
High Speed Tunneling Beneath The Streets Of ManhattanBy Edward S. Plotkin, Thames F. Peyton, Gary A. Almeraris
This paper describes high speed tunneling by drilling and blasting in a heavily populated urban area. The project consists primarily of mining 2500 m (8237 ft.) of tunnel through mica schist, excav
Jan 1, 1985
-
A PC-Based Monitoring System For Mine HoistingBy Timothy J. Orr, Michael J. Beus, Frank T. Duda
The technology to enhance safety and control features for mine shaft hoists is being investigated by researchers at the U.S. Bureau of Mines (USBM). The objective of the research is to prevent injurie
-
Boron: A Review of 1994 ActivitiesBy J. C. Norman
The United States was the world's largest producer and consumer of boron compounds during 1994. According to US Bureau of Mines (USBM) estimates, boron mineral concentrate and chemical production
Jan 1, 1995
-
Geotechnical Investigation, Design And Construction Of The Km 80/86 Tunnels, Tumbler Ridge Branchline, B.C.By R. D. Hendry, R. A. Pearce, Allyn J. Steward, Dennis C. Martin
This paper outlines the geotechnical exploration and design approach utilized for the Km 80 and Km 86 Tunnels on the British Columbia Railway Tumbler Ridge Branchline. Information from surface mapping
Jan 1, 1985
-
TBM Tunneling on the Yucca Mountain ProjectBy James P. Morris, William H. Hansmire
The U. S. Department of Energy's (DOE) Yucca Mountain Project (YMP) is a scientific endeavor to determine the suitability of Yucca Mountain for the first long term, high level nuclear waste repos
Jan 1, 1995
-
Experimental Data Indicating a Direct Link Between the Rate of Stemming Ejection and the Degree of Rock Face Movement in Bench BlastingBy Paul Worsey
A strong inverse relationship between rock face movement and stemming ejection is presented. Previously unpublished data from blast control plug research and development involving high speed video ana
Jan 1, 1990
-
Deteriorating Ground Conditions Lead To Improved Excavation And Ground Support Techniques At The Cantung MineBy W. J. Fotheringham
This paper deals with the mining techniques employed at Canada Tungsten's northern Canadian operations, particularly with respect to their effect on productivity, safety, and stability of relativ
Jan 1, 1985
-
Commissioning the Preparation Plant at the Newlands Coal MineThe process and control technologies incorporated into the coal preparation plant at Newlands were to be used for the first time in Australia. The commissioning organisation and procedures were se
Jan 1, 1986
-
Progress In Hydraulic Mining Of CoalBy David M. Parkes
This paper outlines the achievements to date at the British Columbia mine of Kaiser Resources Ltd. Almost one million raw short tons (855,000 metric tonnes) are now produced per year from a single mon
Jan 1, 1976
-
Composite Foundations For Uplift And Compression In Soft Soils And Swampy Terrain ? SynopsisBy H. S. Radhakrishna
Foundations supporting power transmission and communications towers are subjected to both compression and uplift loads, often of a cyclic nature. Some novel foundations, combining the beneficial featu
Jan 1, 2010
-
Computer Based Decision Support Systems For Underground ConstructionBy Photios G. Ioannou, Guillermo F. Salazar, Herbert H. Einstein, Yeong W. Kim
The MIT tunneling group has developed, over the past decade, a number of decision support tools for the geologist and engineer, planner and designer, owner and contractor involved in underground const
Jan 1, 1987
-
Ground Behavior In Glacial Soils For The Seattle Transit TunnelsBy Michael S. Kucker, Robert A. Robinson, Harvey W. Parker
Ground deformations are of major concern during tunneling, especially in downtown environments, since they have a significant impact on the costs and practicality of tunneling. This case history descr
Jan 1, 1991
-
Compaction Grouting Of The Phoenix Drain TunnelsBy Steven R. Wardwell, Gerald G. Stokes
INTRODUCTION A compaction grouting program to control ground loss, and to minimize surface settlement, was developed for the West Tunnel of the Phoenix Storm Drain Tunnels. The West Tunnel was 4,20
Jan 1, 1987
-
Production Scheduling Optimisation in a Nickel Laterite Deposit:MIP and LP Applications and Infeasibility in the Presence of Orebody VariabilityBy R Dimitrakopoulos
Optimisation and mathematical formulations for open pit design and long-term production scheduling have been available since the 1960s. There are two main concerns in the application of existing mixed
Jan 1, 2003
-
Site Testing For Large Volumes Of Deep SpaceBy R. L. Loofbourow, Robert R. Miller
Deep, stable, unlined space promises secure, efficient, acceptable solutions to several current problems. With truly favorable conditions, it can be economic as well. The basic requirement is suffi
Jan 1, 1981
-
Engineering Potential of Seismic Methods of Assessing Rock Breakage CharacteristicsBy Walter GW
Rock mass classification systems for stable excavation design have been studied. The parameters which are important in such a classification system and those which should be included in a classifi
Jan 1, 1978
-
Pebbles as grinding medium: Interrelationships of some milling parametersBy L. A. Vermeulen, D. D. Howat
The use of pebbles as the medium in the grinding of quartz gravel in a laboratory mil provided experimental data that were used to quantify the relationships between the feed rate of ore to the mil, t
Jan 1, 1988
-
Small Scale Model Testing A New Approach In TBM DevelopmentBy Pieter Barendsen, Olivier Dubugnon
INTRODUCTION There are three fronts on which development efforts are being concentrated to extend the application domain of Tunnel Boring Machines (TBM), which is potentially very large - Assessme
Jan 1, 1985