Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • DFI
    The Innovative CSM - Cutter Soil Mixing System for Constructing Retaining Walls and Cut-off Walls

    By Erwin Stötzer, Renato Fiorotto, Wolfgang G. Brunner, Manfred Schöpf

    "Deep mixing methods can be used economically for the construction of cut-off or excavation support walls where other systems such as traditional soldier beams and lagging walls would yie ld unsatisfa

    Jan 1, 2005

  • DFI
    Innovative Earth Retention Project for a Parking Garage

    By Andreas Brandner, Karl Schoenherr-Strasse, I. B. Brandner, Dipl. Ing

    "A world famous Wintersport resort in the Alpine planned to build a parking garage for more than 600 cars and busses situated between a torrent, a district road and the village.A nearly 200 m long bui

    Jan 1, 2016

  • DFI
    Bored Pile Construction Challenges in Highly Variable Limestone for a Supertall Building

    By Seth K. Martin, Tony Nichlany, Alan R. Poeppel, Konstantinos Syngros

    "This paper presents a case study on bored pile construction in challenging karst conditions below a supertall building in Kuala Lumpur. Innovative design and construction techniques helped keep the p

    Jan 1, 2016

  • DFI
    Ground Freezing Combined Method for Urban Tunnel Excavation

    By Filippo Mira-Cattò, Andrea M. R. Pettinaroli, Elena Rovetto

    "The construction of Powisle station of Metro Warsaw Line 2, in Poland, required the execution of two shafts next to an urban road tunnel adjacent to the Vistula River. The shafts were linked by three

    Jan 1, 2015

  • DFI
    Developing Effective Specifications For Tremie-Concrete Placement In Drilled Shafts

    By Giuliana A. Zelada-Tumialan

    Reduced workability and flowability of the concrete through the tremie tubes and drilled shaft reinforcement have been identified as the main causes of tremie-concrete drilled shaft concrete defects.

    Jan 1, 2009

  • DFI
    Design Of Self-drilling Micropiles For Permanent Applications

    By Racquel Nottingham, Freddy Lopez, Ole Gadermann

    The ongoing urban development is a global phenomenon, placing has high demands on urban infrastructure (housing, public services, transportation, telecommunications, etc.). Micropiling is one of the m

  • DFI
    Design Methodology for Multi-Facetted, Winged Steel Foundations

    By Phillip E. Glogowski, N. Catherine Bazan-Arias

    Steel foundations can be designed to cross-sectional configurations ranging from triangular and square to other multi-side shapes. Adding lateral extensions (hereby called wings) along the length of t

    Sep 8, 2021

  • DFI
    Underpinning Historic Museum for U-505 Submarine Relocation

    By Goudschaal Mark R.

    "The Museum of Science and Industry U-505 Submarine Relocation project in Chicago, IL consisted of building an underground reinforced concrete vault (37' deep) for the Museum's new U-505 exhibit. This

    Jan 1, 2005

  • DFI
    Deep Diaphragm Walls And Bored Piles For Subway Construction At The Amsterdam Central Station

    By Wolf-R. Under

    For improvement of urban traffic infrastructure, the City of Amsterdam is cur­rently constructing the 9.5 km long North-South Metro line passing through the central districts of Amsterdam. Focal secti

    Jan 1, 2006

  • DFI
    Deep Cfa Piles Application For Foundation In Queensland

    By Sameh M. Khella

    This paper discusses the application of deep CFA piles for the foundation of structures in different ground stratifications with a focus on the application in Queensland region. Design, construction t

    Nov 1, 2022

  • DFI
    Installing Deep Foundations for North America's Largest LNG Projects.

    By Richard Shea

    Morris-Shea, an Alabama-based deep foundation contractor, is installing foundation piles at the sites of North America's two largest liquefied natural gas (LNG) terminals currently under construction.

    Apr 1, 2023

  • DFI
    Innovative Design for Retaining Structures using Combined Products

    By Clifford Taylor, Alexander Zöhrer

    "The execution of deep basement excavations under narrow conditions is one of the most challenging tasks in geotechnics. The vicinity of neighbouring buildings, roads, and underground structures such

    Jan 1, 1900

  • DFI
    Horseshoe Secant Compression Shoring System For Tunnel Repair

    By Karen Talbot, Noah Maier, Rob Jameson, Giuseppe Gaspari

    A storage and drainage tunnel advancing below I-75 in Detroit, Michigan experienced sudden subsidence. The Tunnel Boring Machine (TBM) was damaged to the extent that its shield, cutting head and exten

    Oct 1, 2022

  • DFI
    Deep Drilled Shafts For The Pearl Harbor Memorial Bridge New Haven, Connecticut

    By Theodore von Rosenvinge

    Large diameter (2.4 meter) drilled shaft foundations were installed to depths of over 62 meters through soil into Arkose bedrock for Connecticut?s Pearl Harbor Memorial Bridge (I-95 over New Haven Har

    Jan 1, 2011

  • DFI
    Inclusion of Overburden Soils Resistance into Shaft Nominal Capacity for Significant Economic Savings – An Osterberg Cell Load Test Case Study

    By Aditya Ayithi, William G. Ryan, Dean Herbst

    "For rock socketed drilled shafts, it is a common practice not to include the frictional resistance of overburden soils into the nominal capacity estimation. The primary reason often being cited is “o

    Jan 1, 2016

  • DFI
    Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric Project

    By Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews

    "The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re

    Jan 1, 2016

  • DFI
    DFI 2008 Outstanding Project Award Winner Intricate Excavation for the New South Ferry Subway Station

    By Alice Arana, David M. Cacoilo, Joel L. Volterra

    "To make space for the new South Ferry Station in lower Manhattan, engineers and contractors carved out a new tunnel beneath three operating subway tunnels and tangentially to yet another tunnel. Crea

    Jan 1, 2008

  • DFI
    Assessment of Existing Bulkhead Walls for Dredging Impacts

    By Rakam Lama Tamang, Michael J. Byle, Stephen Ernst

    "For various reasons, dredging may become necessary in front of existing bulkhead walls, either for channel deepening or for environmental remediation of contaminated sediments. The removal of sedimen

    Jan 1, 2017

  • DFI
    Application Of Pile Test Data For The Foundation Design Of Rail Viaduct At Carrum, Victoria

    By Nick M. Withers, Suthagarann Visvalingam, Cillian Mc Colgan

    The level crossings removal project in Victoria is removing 75 level crossings across Melbourne to improve safety by separating trains from traffic, with other benefits such as reduced congestion, an

    Nov 1, 2022

  • DFI
    Sustainability: A Role for Blended Cements and Industrial Byproducts in Soil Mixing, Grouting, and Slurry Walls

    By Charles M. Wilk, Lori Tiefenthaler

    "Information presented in this paper can be used to support deep soil mixing, subsurface grouting and slurry wall technology as sustainable construction technologies. Ordinary Portland Cement (OPC) is

    Jan 1, 2017