Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022By M. Trim, Y. Sun, D. Tepavac, A. Kumar
Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse
Dec 1, 2022
-
Design and Construction of Mixed Ground Working Platform for a CCR Surface ImpoundmentBy Juan M. Pestana, Jeremy M. Gasser, Cuneyt Gokmen, Paul J. Sabatini, William Tanner, Daniel J. Woeste
An access pathway and working platform were designed and constructed for equipment access for a Deep Soil Mixing (DSM) pilot study over a coal combustion residual (CCR) surface impoundment (SI). The D
Jan 1, 2019
-
Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent
The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit
Dec 1, 2022
-
Design And Construction Of Shear Pins For Landslide StabilizationBy Fei-chiu Huang
A 17-acre landslide occurred in February 2001, on a slope below Via Bellota in the City of San Clemente, California. Three homes were destroyed and many others placed in jeopardy. The landslide, inv
Jan 1, 2010
-
Design and Construction of the Cannelton Hydroelectric Plant Cofferdam and Cut-Off WallBy James M. Tantalla, Dwight Metcalf, Roderic A. Ellman Jr.
"The construction of a new low head hydro-electric plant at the Cannelton Lock and Dam required the design and construction of a cofferdam to accommodate a deep excavation extending approximately 150
Jan 1, 2016
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in LondonBy Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021By David Mast, Amanda Foote, Mina Shinouda
The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5
Jun 13, 2021
-
Design And Construction Of The Noranda Converter At The Borne SmelterBy Michel Boisvert
Noranda Metallurgy is presently completing construction of the new Noranda Converter (NCV) at its Home Smelter in Rouyn-Noranda. This capital investment of CDN$56M is the continuation of the Emissions
Jan 1, 1998
-
Design and Construction Procurement for the Amtrak Hudson Tunnel ProjectBy Phil Rice, Mohammed Nasim, Richard Flanagan
"The Gateway Trans-Hudson Partnership (GTHP), a joint venture of WSP USA, Inc., AECOM USA, Inc, and STV Incorporated, is providing preliminary engineering services to Amtrak for the Hudson Tunnel proj
Sep 1, 2019
-
Design and Delivery of Micropile Installation Leveraging Augmented and Virtual RealityBy Guilherme L. M. G. Carvalho, Zachary T. Fleming
In a world of 2-dimensional design documents, envisioning and understanding 3-dimensional interferences for complex foundation construction scenarios can be challenging. Videos and computer models ser
Jan 1, 2019
-
Design and Development of Novel Flotation Reagents for the Beneficiation of Mountain Pass Rare-Earth OreBy Pradip
Bastnaesite, a rare-earth fluocarbonate, was separated from associated calcite and barite gangue minerals in the Mountain Pass, CA rare-earth ore beneficiation plant by froth flotation using fatty aci
-
Design and Evaluation of the Roof Bolt Corrosion Test System in a Simulated Underground Coal Mine Environment Mining, Metallurgy and ExplorationBy Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat
Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst
-
Design and Evaluation of the Roof Bolt Corrosion Test System in a Simulated Underground Coal Mine Environment Mining, Metallurgy and Exploration (7cabb148-285f-4ad0-9583-a6d360323de4)By Kanchan Mondal, Gopi Bylapudi, Anand Bhagwat
Corrosion of steel roof support systems can cause potential premature failure of the support, thus adversely affecting the excavation stability and rock-related safety. An in-house corrosion test syst
-
Design and Implementation of a Fully Integrated Mine Information Management SystemBy Thomas S. Kovach
In today's competitive energy market, every effort must be made to assure the lowest possible production cost. 'rhi s. paper describes the cooperative effort between the coal producer and th
Jan 1, 1989
-
Design And Implementation Of New Moulds For The CastersBy Chad B. Donovan
There is a strong need in North America and other major steel producing markets where major capital investment in new equipment has been minimal over the past several years to make improvements to exi
Oct 30, 2017
-
Design and In-Construction Geologic Characterization of Micropiles to Support a Historic Transmission Line Upgrade in the Steep Talus and Basalt Slopes of the Columbia River GorgeBy Brian J. Olson, Kevin Haiar
Originally constructed between 1939 and 1941 as part of Franklin D. Roosevelt’s New Deal programs, the Bonneville to Hood River 115 kV Transmission Line required an infrastructure upgrade to remain re
Sep 8, 2021
-
Design and Maintenance of Platework and Vessels in MinesBy A. J. Paul Laprairie
The process for which it is to be used is too often the only consideration in the design of a vessel. A de-sign allowing for practical manufacture and erection, as well as for proper maintenance, can
Jan 1, 1963
-
Design and Materials Selection of Autoclaves and Auxiliary EquipmentBy P. Cheung, J. Gulyas, R. Clary
Over the past 50 years, the use of autoclaves in the metallurgical industry has evolved from final metal recovery (hydrogen reduction) and purification (sulphide precipitate oxidation) to treating who
Jan 1, 2004
-
Design And Operation Of A Novel Gas Cooler For Refimet Copper Smelter, La Negra, ChileBy Tim J. A. Smith
Fundicion Refimet S.A. has operated a custom copper smelter at La Negra, near Antofagasta in northern Chile since 1993. From an initial operation based on Reverb smelting and Peirce-Smith, converting,
Jan 1, 1998
-
Design and operation of large drum scrubbersBy G S. Beros, K M. Edwards
Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o
Sep 18, 2023